MANAGEMENT REFURBISHMENT -------------------------------------------------------------------------------------------- Global
Switch Project, Harris Street, PYRMONT
|

|
|

|
MAIN
CONTRACTOR: FLETCHER
CONSTRUCTIONS Project
Manager: Mr Ian Grant Estimator:
Mr Keith Bacon
INSTALLATION
AREA OF TOPPING: 30,000
mē
|
|
ALLSEAL
was asked to Provide a wearing surface to
withstand the ongoing demands of construction
whilst maintaining a suitable surface for
the installation of computer flooring. The
total area was covered in old bitumen parquetry
adhesive and was mechanically removed by
captive shotblasting therefore enabling
the concrete topping sufficient adhesion
to warrant the topping installed. The average
thickness range from 70mm down to 4mm and
installed by Putzmiester Pump.
|
|
|