Allseal Projects

HOSPITALS & HEALTH CENTRES
--------------------------------------------------------------------------------------------
Royal Prince Alfred Hospital Redevelopment

RPA
 

RPA floor

MAIN CONTRACTOR: THEISS CONTRACTOR
Project Manager:
Mr Mick Fiddock
Foreman:
Tony Russo
CSR:
Tapan Bose

ARCHITECT:
S.T.H.D.J. - Silver Thomas Hanely Daryl Jackson

INSTALLATION AREA OF TOPPING: 40,000mē


Due to the high demands of current concrete works, it is difficult to achieve the desired tolerances required for vinyl flooring due to size of the pours and post tension slabs. ALLSEAL was therefore contracted by CSR Construction Services to rectify these imperfections and to achieve a suitable surface for the vinyl contractor PKF Flooring. The self smoothing cement was installed to 40,000mē at an average thickness of 4-6mm.
 

 

Back to Project Index page
 


Link to Spec-Net Construction and Engineering Gateway

| home | floor stripping | diamond grinding | shot blasting | scarifier/scrabbler |
|
cementitious flooring | epoxy coating | allseal projects | contact us |

ALLSEAL HEAD OFFICE:
19 Melia Court, Castle Hill, NSW 2154
Telephone: (02) 9659 2701 - Facsimile: (02) 9659 2702