& HEALTH CENTRES -------------------------------------------------------------------------------------------- Royal
Prince Alfred Hospital Redevelopment
|

|
|

|
MAIN
CONTRACTOR: THEISS
CONTRACTOR Project Manager: Mr Mick
Fiddock Foreman: Tony Russo CSR:
Tapan Bose
ARCHITECT:
S.T.H.D.J.
- Silver Thomas Hanely Daryl Jackson
INSTALLATION
AREA OF TOPPING: 40,000mē
|
|
Due
to the high demands of current concrete
works, it is difficult to achieve the desired
tolerances required for vinyl flooring due
to size of the pours and post tension slabs.
ALLSEAL was therefore contracted by CSR
Construction Services to rectify these imperfections
and to achieve a suitable surface for the
vinyl contractor PKF Flooring. The self
smoothing cement was installed to 40,000mē
at an average thickness of 4-6mm.
|
|
|