ALLSEAL

ALLSEAL PTY. LTD.

Home
Floor Stripping and Coating Removal
Diamond Grinding
Shot Blasting
Scarifier/Scabbler
Cementitious Flooring and Specialised Coating
Epoxy Coating / Sealing
Allseal Projects
Contact Us

 

Working in conjunction with
Master Builders Technologies 

Allseal Projects

HOSPITALS & HEALTH CENTRES
--------------------------------------------------------------------------------------------
St Vincents Hospital Redevelopment

St Vincents Hospital
 

St Vincents Hospital

MAIN CONTRACTOR: LEIGHTON CONTRACTOR
Project Manager:
David Mayton
Foreman:
Ken Wilson


INSTALLATION AREA OF TOPPING: 15,000mē


Due to the high demands of current concrete works, it is difficult to achieve the desired tolerances required for vinyl flooring due to size of the pours and post tension slabs. ALLSEAL was therefore contracted by Leighton Construction to rectify these imperfections and to achieve a suitable surface for the vinyl contractor PKF Flooring & General flooring. The self smoothing cement was installed to 15,000mē at an average thickness of 4-6mm.
 

 

Back to Project Index page
 


Link to Spec-Net Construction and Engineering Gateway

| home | floor stripping | diamond grinding | shot blasting | scarifier/scrabbler |
|
cementitious flooring | epoxy coating | allseal projects | contact us |

ALLSEAL HEAD OFFICE:
19 Melia Court, Castle Hill, NSW 2154
Telephone: (02) 9659 2701 - Facsimile: (02) 9659 2702