Vincents Hospital Redevelopment
|

|
|

|
MAIN
CONTRACTOR: LEIGHTON
CONTRACTOR Project Manager: David
Mayton Foreman: Ken Wilson
INSTALLATION
AREA OF TOPPING: 15,000mē
|
|
Due
to the high demands of current concrete
works, it is difficult to achieve the desired
tolerances required for vinyl flooring due
to size of the pours and post tension slabs.
ALLSEAL was therefore contracted by Leighton Construction
to rectify these imperfections and to achieve
a suitable surface for the vinyl contractor
PKF Flooring & General flooring. The
self smoothing cement was installed to 15,000mē
at an average thickness of 4-6mm.
|
|
|